XT375 / XT475 / XT675
10
STEP 2
1. Moun t the L&R Handle bars onto Handle bar mounting plates at the top of the upright
tubes with four 5/16 x 2 Button Head Socket Bolts and four curved washers. NOTE:
The L&R handlebars are different. The Right handle bar has two w ires and the
switches on the handle bar say “Fast and Slow” while the Left handle bar switch
says “Up and Down”.
STEP 3
1. Install the L & R inside console end caps onto the ends of the 1-1/4 X 2-3/8 console
mounting tube. Ensure the end caps are oriented correctly and facing the correct direction
(see diagram). Also ensure that the wiring is fed through the end caps.
2. Place the console onto the L & R mounting brackets at the top of the upright tubes. Then
install and hand tighten the two 5/16 x 2-3/4 Hex Head bolts and flat washers through
the holes in the top and front of the 1-1/4 X 2-3/8 console mounting tube.
3. Connect all of the connectors from the console to the mating connec tors at the top of the
upright tubes. There should be three connectors on the right side and one connector on
the left side.
4. Install the outside pieces of the console end caps with six 3.5mm x 25mm Phillips head
Screws. (Be careful not to cut or pinch the wires.)
STEP 4
1. Tighten all the bolts securely from the previous steps.
2. The mounting screws for the Upright covers are screwed into the base of the treadmill.
You must remove these first. Install the six 3.5mm x 25mm Phillips head Screws into the
upright covers.
3. Attach the two Bolt Access Caps onto the Console end Caps .