with Incline Cable (upper).

STEP 7

Install the Console onto the Left and Right Handrails with 2 pcs of 5/16” x 1/2” Button Head Socket Screws by using the M5 Allen Wrench.

PLEASE LOCK DOWN ALL HARDWARE AFTER THE

ACCESSSORIES HAVE BEEN ASSEMBLED.

Z9 Folding Instructions

Do not attempt to move the unit unless it is in the folded and locked position. Be sure the power cord is secured to avoid possible damage. Use both handrails to maneuver the unit to the desired position.

To Fold The Treadmill:

Make certain the treadmill is at minimum incline. Lift the treadmill running deck until it is secured by the locking telescoping tube assembly in center back of base.

To Unfold The Treadmill:

Apply slight forward pressure* on the treadmill running deck with one hand. Pull down on the unlocking lever and slowly lower the running deck to the floor. The deck will lower unassisted when it reaches about waist high.

*At the rear roller area to relieve pressure on the locking system.

Transport

Z9

The treadmill is equipped with four transport wheels which are engaged when the treadmill is folded. After folding simply roll the treadmill away.

7

Z9

Page 8
Image 8
Spirit owner manual Z9 Folding Instructions, Transport