ASSEMBLY INSTRUCTIONS
(10) Handrail | Nylon Bed |
Shaft |
|
| (10) Handrail |
RIGHT |
|
| Shaft |
| LEFT |
STEP 10: Slide the LEFT and RIGHT PROTECTIVE COVERS(26, 27) onto each side of the BASE ASSEMBLY. Make sure the SHAFTS on the FRONT FRAME(1) poke out through the hole on the
PROTECTIVE COVERS(26, 27).
NOTE: Do not secure the PROTECTIVE COVERS(26, 27) to the FOLDING LINKAGES(3) with the SECURING STRAPS on the covers until STEP 12.
STEP 11: Attach the LINKAGE(7) onto the LEFT HANDRAIL ASSEMBLY(8) with the LOCKING KNOB(11). Slide the LEFT HANDRAIL ASSEMBLY(8) onto the SHAFT in the FRONT FRAME(1) and secure in position with the LOCKING KNOB(11). Repeat on other side.
STEP 12: Attach the LINKAGES(7) onto the LEFT and RIGHT PIVOT ARMS(5, 6) with BOLTS (M8x1.25x25mm)(46), WASHERS(M8)(51), and NYLOCK NUTS(M8x1.25)(49). DO NOT OVER TIGHTEN THE BOLTS. Pull the PROTECTIVE COVERS(26, 27) down until the bottom of the covers are slightly lower than the FOLDING LINKAGES(3). Secure the PROTECTIVE COVERS(26, 27) to the FOLDING LINKAGES with the SECURING STRAPS on the covers.
NOTE: When the PROTECTIVE COVERS(26, 27) are assembled correctly the FOLDING LINKAGES(3) should not be visible.
STEP 13: Verify that the handlebars function correctly before using the Therapy Inversion System. Move the Nylon Bed on the MAIN FRAME(4) backward toward the inverted position. The HANDRAILS(10) must move forward as the MAIN FRAME(4) moves backward. If the HANDRAILS(10) do not move forward check ASSEMBLY STEPS 2, 11, and 12.
10