State Industries GP 6 50YPC T 100 Electrical Connections, Solar Installation, Wiring Diagram

Models: 317998-002 GP 6 50YPC T 100 GP 6 40YPC T 100

1 40
Download 40 pages 9 Kb
Page 18
Image 18

A diaphragm-type expansion tank suitable for potable water will normally eliminate this weeping condition. Please read and follow the manufacturer’s instructions for the installation of such tanks.

Electrical Connections

WARNING

Domestic

Must Be Vertical To

Remove Air Bubbles

Hot Water

 

Out

Vacuum

Mixing

Relief

Valve

Valve

 

Hot

 

Water

 

Out

 

Unions

To Air

 

 

Handler

 

Shut-Off

 

Valve

Expansion Tank

Cold Water Inlet

Flow Control

Pump Valve

Out

In

 

 

Coil

Air

Handler

Electric Shock Hazard

Disconnect power before servicing.

Replace all parts and panels before operating.

Failure to do so can result in death or electrical shock.

Before plugging in the water heater, always make sure:

MASSACHUSETTS CODE

DOES NOT ALLOW THIS

TYPE OF INSTALLATION.

Typical Mixing Valve Installation Combination

Space Heating/Potable Water Heating System

FIGURE 16

Also see Water System Piping for additional instructions on the safe and correct installation and operation of this water heater.

Solar Installation

If this water heater is used as a solar storage heater or as a backup for the solar system, the water supply temperatures to the water heater tank may be in excess of 120°F. A mixing valve or other temperature limiting valve must be installed in the water supply line to limit the supply temperature to 120°F.

NOTE: Solar water heating systems can often supply water with temperatures exceeding 180°F and may result in water heater malfunction.

The Voltage and frequency correspond to that specified on the water heater.

The electrical outlet has the proper overload fuse or breaker protection.

Unit is to connect to a 120VAC electrical supply outlet (extension cord is not allowed).

IMPORTANT: Do not use an extension cord to connect the water heater to an electrical outlet.

The water heater and the outlet are properly grounded.

Installed in accordance with prevailing provisions of local codes, or in the absence of such, National Electric Code, ANSI/NFPS 70 current edition.

Completely fill the tank with water and check all con- nections for leaks. Open the nearest hot water faucet and let it run for three (3) minutes to purge the water lines of air and sediment and to ensure complete filling of the tank. The Electrical power may then be turned on. Verify proper operation after servicing.

Wiring Diagram

Air Intake

Gas Control

Valve / Thermostat

Chamber Fan

 

Pressure

Switch

Igniter/Flame

Sense Connector

FV

Sensor

CAUTION:

LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION. VERIFY PROPER OPERATION AFTER SERVICING.

Anode

Rod

Control Display

CAUTION:

DO NOT USE AN EXTENSION CORD TO CONNECT THE TRANSFORMER TO AN ELECTRICAL OUTLET.

Power Supply

Transformer

18

Page 18
Image 18
State Industries GP 6 50YPC T 100, GP 6 40YPC T 100, 317998-002 Electrical Connections, Solar Installation, Wiring Diagram