FOREWORD
This design complies with the current edition of ANSI Z21.10.3 as an automatic circulating tank type water heater and automatic storage water heater.
Detailed installation diagrams are found in this manual. These diagrams will serve to provide the installer with a reference for the materials and methods of piping necessary. It is highly essential that all water, gas piping and wiring be installed as shown on the diagrams.
Particular attention should be given to the installation of thermometers at the locations indicated on the diagrams as these are necessary for checking the proper functioning of the heater.
In addition to these instruct ions, the equipment shall be installed in accordance with all local codes. The authority having jurisdiction should be consulted before installing.
In the absence of local codes, the installation must comply with the current editions of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the National Electric Code, NFPA 70. The former is available from the Canadian Standards Association, 8501 East Pleasant Valley Road, Cleveland, OH 44131, and both documents are available from the National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02269.
TABLE OF CONTENTS
| PAGE |
| PAGE |
2 | Chemical Vapor Corrosion | 14 | |
INSTALLATION INFORMATION | 3 | VENTING | 15 |
FOREWORD | 4 | Vent Terminals | 15 |
FEATURES | 5 | Pressure Switches | 15 |
Water Temperature Control | 5 | Gas Piping | |
High Limit Switch (E.C.O.) | 6 | Connection of Gas Pipe | 16 |
Dishwashing Machine Requirement | 5 | Purging | 16 |
Circulating Pump | 6 | Gas Meter Size - City Gases Only | 16 |
PLUMBING MANIFOLD ASSEMBLY | 6 | Gas Pressure Regulation | 16 |
Flow Diagram | 5 | Gas Valves | 17 |
Automatic Air Bleed Valve | 5 | SYSTEM CONNECTIONS | 17 |
Hot Return Recirculation Pump | 7 | Thermometers | 17 |
Drain Valve | 7 | Relief Valve | 17 |
AIR SYSTEM ASSEMBLY | 7 | Water Line Connections | 17 |
Blower Assembly | 7 | Closed System | 17 |
Blower Plenum | 7 | Water (Potable) Heating and Space Heating | 17 |
Air Hose | 8 | Water Heater Wiring | |
Flue Adapter | 8 | OPERATION | |
Exhaust Vent | 8 | Sequence of Operation | 21 |
CONTROL SYSTEM | 8 | Error Codes | 21 |
Blocked Outlet Switch | 8 | Fault Conditions | |
Blocked Inlet/Prover Switch | 8 | PRIOR TO | 22 |
Low Gas Pressure Switch | 9 | Required Ability | 22 |
On/Off Switch | 9 | OPERATING INSTRUCTIONS | 23 |
Hot Surface Igniter | 9 | Adjustment Procedure (Initial | |
OIM - Outdoor Interface Module | 9 | Cathodic Protection | 24 |
WR Ignition Control Board | 9 | Precautions | 24 |
Low Water Cutoff Board and Probe | 10 | Lighting & Operating Label | 25 |
Thermostat/E.C.O. Probes | 10 | GENERAL INFORMATION | 26 |
Transformer | 10 | Power Burner | 26 |
Junction Box | 10 | High Limit | 26 |
TANK ASSEMBLY SYSTEM | 10 | High Altitude Installations | 26 |
Tank Insulation | 10 | MAINTENANCE | 26 |
CABINETASSEMBLY | 11 | General | 26 |
Cabinet Panels | 11 | Maintenance Schedule | 26 |
ADDITIONAL CONTROLS | 11 | Flushing | 26 |
Gas Valve | 11 | Draining | 26 |
Flame Sensor | 11 | Sediment Removal | 26 |
INSTALLATION INSTRUCTIONS | 11 | Lime Scale Removal | |
Required Ability | 11 | Anode Inspection and Replacement | 27 |
Insulation Blankets | 11 | Drain Valve and Access Panels | 27 |
Locating The Heater | Relief Valve | 27 | |
Provide Unit Support | 12 | Circulating Pump | 27 |
Roof Curb | Vent System | 27 | |
Rig and Place Unit | 13 | INSTALLATION DIAGRAMS | |
Outdoor Stand | 14 | CHECKLISTAND SERVICE INFORMATION | 33 |
Clearances | 14 | ||
Hard Water | 14 | REPLACEMENTPARTS | 34 |
Air Requirements | 14 | LIMITED WARRANTY | 35 |
4