Floor-Mount Installation

Use the following procedure to install the RPV using the floor stand: (See Figure 2 for more information.)

1.Assemble the stand by inserting the standard into the floor plate and tightening the set screw.

2.Complete the assembly by following steps 3 throuh 6 on page 12.

3.Position the floor stand so the clean-out and inspection hatches are accessible and the material hoses do not interfere with workspace or create a tripping hazard.

Figure 2: Floor-Mount Configuration

Remote Proportioning Valve

Chapter 4: Installation

14 of 30

Page 15
Image 15
Sterling 882.00268.00 specifications Floor-Mount Installation, Floor-Mount Configuration