4-2 Installing the RPV Controls
DANGER! Disconnect and lock out power before working on equipment. Do not reconnect electric power until the installation is complete, the work has been checked, and all tools are removed, and all safety devices are activated. All electrical work must conform to all codes in effect at the installation site.
Installing the RPV-A Autoload Knob Box Control
If your RPV has the
1.Disconnect and lock out power to the Autoloader Hopper Loader.
2.Wire the RPV Material A and B solenoids to the Autoloader Hopper Loader control box using 16AWG wire. See Figure 3.
3.Remove Jumper W3 installed between Terminals 13 and 14 on Terminal Block TB1 in the Autoloader Hopper Loader control box.
Note: The knob box control will not function properly unless you remove this jumper.
4.Toggle the power switch on the Autoload Hopper Loader to the ON position. This switch must be ON to use the Knob Box Control as a remote ON/OFF switch.
5.Plug the white logic plug connected to the RPV knob box into the receptacle marked J2 on the left side of the Autoloader control enclosure. See Figure 4 on page 17.
6.
Figure 3: RPV-A to Autoloader Wiring Diagram
Remote Proportioning Valve | Chapter 4: Installation | 16 of 30 |