Sterling SDF 250, SDF 400, SDF 500 manual Maintenance schedule

Models: SDF 500 SDF 250 SDF 400

1 72
Download 72 pages 16.54 Kb
Page 40
Image 40
5.1. Maintenance schedule

 

SDF 250/400/500

5.1. Maintenance schedule

Daily:

Check warning signs on equipment for good legibility and completeness

 

Clean return air filters and casing (depending on dust build-up)

Weekly:

Check main switch for proper function

 

Check the signal lamps for proper functioning

Every three months:

Clean filter of the regeneration blower (depnding on amount of dust

 

collected)

Every six months:

Change return air filters (depending on dust build-up)

 

Clean air filter of the suction box

 

All electrical and mechanical connections should be checked to see if

 

they fit securely

Annually:

Dewpoint should be checked (only by Sterling service personnel)

Whenever the

 

material is changed:

The drying hopper and suction box must be cleaned

&The service intervals refer to a 3-shift operation.

FThe given maintenance intervals are average values.

Check whether in your individual case the maintenance intervals must be shortened.

Maintenance 5-3

Page 40
Image 40
Sterling SDF 250, SDF 400, SDF 500 manual Maintenance schedule