STT 1600
3.6. Starting continuous operation
When you have carried through all basic settings, you can start with continuous operation.
F
Make sure that hoppers which are not in use are separated from the dehumidified air supply.
Make sure that the set drying temperatures are suited for the materials in the hoppers.
After first filling, do not process the material until after the dwelling time.
If a return air cooler is installed, switch on the coolant circuit of the return air cooler.
Make sure that the cooling appliance is connected to the mains socket (if present, optional).
Check setting of the timer.
Select ”Main menu”.
Acknowledge with the
or
Press the
Select ”Dryer on”.
Acknowledge with the