Seal the Bottom Track

Install the Bottom Track

Apply silicone sealant here.

Underside of

Strike Side

Plastic Plug

Bottom Track

Pivot Bushing

Bottom Track

Pivot Side

Masking Tape

6. Caulk and Install the Bottom Track

Remove the bottom track.

Apply silicone sealant to the underside of the bottom track, as shown.

Make sure the ledge is clean and install the bottom track at the location marked on the shower ledge.

Use masking tape to hold the bottom track in place.

IMPORTANT! Illustration shows a left side pivot. Reverse the pivot bushing and plastic plug for a right side pivot.

Insert the plastic plug into the hole on the strike side of the bottom track.

Insert the pivot bushing into the hole on the pivot side of the bottom track.

Sterling

9

1034026-2-D

Page 9
Image 9
Sterling Plumbing SP1500D Series manual Caulk and Install the Bottom Track, Seal the Bottom Track