Cut the Top Track

Install the Pivot Block

Front side of top track

Pivot End for Left Side Pivot

Front side of top track

Important: Do not cut on the pivot end.

Pivot End for

Right Side

Pivot

Mark and cut on strike end of top track.

Pivot Block

Insert block into the pivot side.

Pivot Block

9. Measure and Cut the Top Track

Position the top track near the shower opening with the front side of the track toward the outside of the shower.

Measure the distance above the jambs from wall to wall.

IMPORTANT! It is very important that you measure from the pivot end to the strike end of the top track.

Measure from the pivot side of the top track to the strike jamb side, then mark the strike jamb side at the determined distance.

NOTE: For best results, use a 32-teeth per inch hacksaw blade and miter box. Make the cut on the inside of the mark with the blade as close as possible to the mark.

Cut the top track at the mark on the strike end.

File the rough edges smooth where the bottom track was cut, taking care to avoid damaging finished areas.

10. Install the Blocks

Insert the smaller end of the pivot block in the pivot side of the top track.

Sterling

11

1034026-2-D

Page 11
Image 11
Sterling Plumbing SP1500D Series manual Measure and Cut the Top Track, Install the Blocks