SITE REQUIREMENTS
1. FLUE OUTLET POSITIONS
Terminal
Flue
Vertical
Measurement
Horizontal
Measurement
150mm
max
Adjacent
Building
Insulation
|
|
| The vertical measurement is the lowest from either the | |
|
|
| point of discharge or 150mm above insulation. | |
|
|
|
|
|
| Position On Roof | Minimum Clearances |
| IMPORTANT: Seek specialist |
|
|
|
| |
| On ridge or within 600mm | 600mm above ridge |
| |
A |
| advice if installing in a dwelling | ||
B | Elsewhere on roof | 2300mm horizontally from roof surface and: | with a thatched roof | |
| ||||
|
| a) 1000mm above highest point of flue exit |
|
|
|
| from roof or |
|
|
|
| b) as high as the ridge |
|
|
|
|
|
|
|
C | On pitched, within 2300mm horizontally to | 1000mm above top of opening |
|
|
| openable window, dormer |
|
|
|
D | Within 2300mm of another building | 600mm above top of building |
|
|
2. HEARTH DIMENSIONS
150mm
minimum
150mm
minimum
Constructional Hearth
840mm minimum
2.1 | The appliance must stand on a |
| constructional hearth which is at least 125mm thick with |
| the minimum dimensions as shown in diagram. |
2.2 | The building must have a suitable |
| the hearth and appliance. |
| • Consult a structural engineer for advice before proceeding |
2.3 | When fitting into an existing hearth check: |
| • That the appliance complies with current construction |
| regulations and is at least the minimum sizes shown |
2.4 | If there is no existing fireplace or chimney it is possible to |
| construct a suitable |
| setting. The flue must be installed in accordance with all |
225mm
minimum 150mm
Constructional Hearthminimum 840mm minimum
PR7216R
local and national regulations and current rules in force . |
• Check if adding a new chimney to your property requires |
planning permission |