Stovax 5 manual Commissioning, Installation Instructions

Models: 5

1 23
Download 23 pages 30.25 Kb
Page 13
Image 13
COMMISSIONING

INSTALLATION INSTRUCTIONS

COMMISSIONING

1.COMMISSIONING

1.1Close all openable doors and windows in the room, ignite the stove and operate on maximum for 10 minutes. Remove the plastic sight plug from the right hand side of the stove. Position a lighted smoke match just inside the draught diverter opening and check that all smoke is drawn into the opening by viewing through the sight hole. See diagram 1. If there is any doubt, run the stove for a further 10 minutes, and repeat the test.

1

1.2If there are any extractor fans in adjacent rooms, the test must be repeated with the fans running on maximum and interconnecting doors open.

IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE AND SEEK EXPERT ADVICE.

For future reference record the installation details on the commissioning sheet page 3 of these instructions.

13

Page 13
Image 13
Stovax 5 manual Commissioning, Installation Instructions