Sub-Zero PRO 48 S Ta L L At I O N C H E C K L I S T, Installation C H E C K L I S T

Models: PRO 48

1 76
Download 76 pages 10.47 Kb
Page 20
Image 20

P R O 4 8 I N S T A L L A T I O N C H E C K L I S T

I N S TA L L AT I O N C H E C K L I S T

The importance of the installation of the Sub-Zero PRO 48 cannot be overemphasized. Proper installation is the responsibility of the selling dealer or installer.

IMPORTANT NOTE: To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been over- looked.

Any questions or problems about the installation should be directed to your Sub-Zero dealer or go to the locator page of our website, subzero.com, to find the regional distributor by country.

I N S T A L L A T I O N C H E C K L I S T

Has the packing material been removed?

Has any damage to stainless steel been noted?

Turn the unit on. Is it operating properly? If not, is the unit plugged in? Is the control button turned on?

Is the water supply line connected and not leaking?

Has anti-tip bracket been installed securely?

Is the unit leveled properly on a solid, level floor?

Has the drain pan been installed properly?

Is the kickplate installed?

Are the grille screws back in position?

Are the doors and drawers adjusted for proper operation, sealing and alignment? Does either door need a 90° door stop?

Does your customer understand the unit's operation?

Is the water supply turned on and ice maker switch on?

20

Page 20
Image 20
Sub-Zero PRO 48 installation instructions S Ta L L At I O N C H E C K L I S T, Installation C H E C K L I S T