3.6. Consolidation development/test/integration/production

Requirement

[ug] Usually, further systems supporting the same application exist while an application is in production:

Development systems

Test systems

Integration systems, with simulation of the application environment where applicable

Disaster recovery systems

Solution

[ug] The different systems can be implemented on a computer in zones. The details:

Sparse-root zones, that is, the zones inherit everything possible from the global zone.

Option: Resource pools with their own processor set for production.

Option: Application administrator with root access.

Option: Software installation per mount.

Option: OS release upgrade per flash image.

Assessment

[ug] This use case has the following characteristics:

Fewer computers need to be operated overall. Therefore, savings can be made on space, power consumption and air conditioning.

The applications can be tested on exactly the same environment that they are to be run on later.

Switch to a new software version in production can be achieved simply by rerouting the load to the zone with the new version. Installation after test is not required.

Develop- Test Production Integration ment

Global Zone

System

Figure 12: [dd] Use case: Consolidation development/test/integration/production