Superior BC36MH Installing Offsets, Offset Elbow Assembly, Return Elbow Assembly, Blower Kit

Models: BCD36MH BC36MH

1 20
Download 20 pages 17.13 Kb
Page 14
Image 14

14

Underside Of Chimney

Figure 33

FTF8-E30 Return Elbow*

 

Chimney Section (S)

 

FTF8-30 Offset Elbow*

B

A

 

*Part of Offset/Return Package Model FTF8-ES30

Figure 34

 

INSTALLING OFFSETS

First, review the Offset Elevation Chart and Figure 34 for reference.

Step 1. Determine the offset distance where chimney is to pass through the first ceiling-dimension “A.” To find this point on your ceiling, first determine the center point for a vertical chimney following the instructions for vertical installation.

Measure height to the ceiling from the top of fireplace-dimension “B.” Use the appropriate Offset Elevation Chart to find dimension “A.” Mark point where you will drive your nail to show the center point for your offset ceiling cut.

Step 2. Proceed by using the Straight Up In- stallation Instructions for cutting and framing ceiling and roof openings.

Note: See Framing and Dimension Chart for the sizes of the ceiling and roof openings. The size of the roof opening varies with the degree of pitch of the roof.

Offset Elbow Assembly

Offset elbows install the same as chimney sections. First, snap the inner section INTO the preceding inner section of flue. Check connec- tion by pulling up slightly to ensure a tight fit. Next, the outer sections snap lock OVER the preceding outer section of chimney. Again, check outer section by pulling up slightly to ensure proper connection is made.

Return Elbow Assembly

Return elbows install the same way as round terminations and stabilizers:

Step 1. Hold return elbow over top of last chimney section.

Step 2. Center inner slip section into inner flue pipe-slip down.

Step 3. Center outer-locking section over outer chimney pipe. Push down until locking joint has firmly engaged.

Step 4. Pull up slightly on return elbow to ensure locking joint has firmly engaged.

Step 5. Secure support straps to framing members by nailing under tension in sheer (Figure 35).

Return

Elbow

Figure 35

Notes:

The return elbow assembly performs the same function as a stabilizer. Consider this when determining the need for a stabilizer.

Do not apply excessive pressure to any subsequent chimney section following return elbow assembly when installing. Ensure that each subsequent chimney section is securely attached by testing as noted above.

OPTIONAL EQUIPMENT

CONSIDERATIONS

Blower Kit

A Blower Kit model BFK36 is preinstalled, standard, on model BCD36MH and is available as an option for model BC36MH. The optional Blower Kit can be installed prior to or after installation of the fireplace.

Note: These fireplace models are not supplied with an optional wall switch (FWSK) for fan operation. BFK36 blower kits may be operated with their integral blower (On/Off) switch.

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

IMPORTANT

The fireplace must be wired to the house electrical system at the time of installation in order for the fans to operate, (See Figures 36 and 37).

POWER TO THE FIREPLACE The Optional Blower Kit Operates on 115 volt 60 Hz 150 watts AC

HOUSE

WIRING

GROUND

WIRE

COVER PLATE

House Wiring Must Be Secured

Replace Cover Plate

With The Appropriate Electrical

After Electrical

Connector To The Fireplace

Hook-Up

Convenience Outlet Wiring

 

Figure 36

BLOWER THREE

PRONGED PLUG TO

GROUNDED OUTLET

Figure 37

Note: The utilization of fans will increase the air flow around the firebox. However, only a minimal increase in heat output should be anticipated.

IMPORTANT

This fireplace is not intended to be used as a substitute for a furnace to heat an entire home. Use for supplementary heating only.

The BFK36 Blower Kit is design certified by War- nock Hersey for use with these appliances.

Page 14
Image 14
Superior BC36MH Installing Offsets, Offset Elbow Assembly, Return Elbow Assembly, Optional Equipment Considerations