1. Construct the appliance framing.

FRAMING SPECIFICATIONS CONTINUED

TYPICAL INSTALLATION SEQUENCE

Back Wall of Chase/Enclosure Including Finishing Materials, If Any. Optional FOAK-4 or FOAK-4LD3. Position the appliance. Outside Air Kit C

D

 

B

 

A

Square Housing Not

Rough Framing Face

Used on 5500 Model

(Unfinished Shown)

Note: If the Outside Combustion Air Kit is to be installed, it must be installed before the appliance is framed and enclosed in the finishing walls.

The typical sequence of installation follows, however, each installation is unique resulting in variations to those described.

1. Construct the appliance framing.

2. Route gas supply line to appliance location.

3. Position the appliance.

4. Install the vent system and exterior termina-

tion.

5. Field wire and install operating control switch.

Install optional Forced Air Kit, if required

Model No.

 

A

B

C

D

 

 

 

 

 

 

GHC/GRD-5500

in.

57 1/2

36

40 3/4

29

 

 

 

 

 

mm

1461

914

1035

737

 

 

 

 

 

 

 

GHC/GRD-6500

in.

65 3/4

40 3/4

46 1/2

32 7/8

 

 

 

 

 

mm

1670

1035

1181

835

 

 

 

 

 

 

 

Corner Installation

Figure 6

Optional FOAK-4 or FOAK-4LD

Note: If the Outside Combustion

Air Kit is to be installed, it must

Outside Air Kit

be installed before the appliance

Back Wall of Chase/Enclosure

is framed and enclosed in the

Including Finishing Materials, If Any.

finishing walls.

 

6. Make connection to gas supply.

7. Install optional Outside Combustion Air Kit,

if required.

8. Install the logs and rockwool.

9. Install the optional glass doors/enclosure

panel, if required

10. Checkout appliance operation.

11. Spillage Test and Safety Limit Switch

Operation.

12. Adjust burner to ensure proper flame

B

A

4IN.

(103 MM)

Square Housing Not

Used on 5500 Model

Figure 7

 

 

 

Model No.

 

A

B

 

 

 

 

 

 

 

 

 

 

GHC/GRD-5500

in.

36

15 1/2

 

 

 

 

 

 

 

 

 

mm

914

394

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GHC/GRD-6500

in.

40 3/4

18

 

 

 

 

 

 

4 IN.

 

mm

1035

457

 

 

(103 MM)

 

 

 

 

 

 

 

 

 

 

Rough

 

 

 

 

 

Framing Face

 

 

 

 

 

(Unfinished Shown)

 

 

 

 

 

Inside Chase Installation

appearance.

PRE-INSTALLATION NOTES

The fireplace may be installed directly on a combustible floor or raised on a platform of an appropriate height. Do not place fireplace on carpeting, vinyl or other soft floor coverings. It may, however, be placed on flat wood, ply- wood, particle board or other hard surfaces, extending the full depth and width of the appli- ance. Be sure fireplace rests on a solid continu-

Optional FOAK-4

Back Wall of Chase/Enclosure

or FOAK-4LD

Including Finishing Materials, If Any.

Outside Air Kit

 

 

 

 

B

 

A

Rough

Square Housing Not

Framing Face

(Unfinished Shown)

Used on 5500 Model

 

Note: If the Outside Combustion Air Kit is to be installed, it must be installed before the appliance is framed and enclosed in the finishing walls.

Model No.

 

A

B

 

 

 

 

GHC/GRD-5500

in.

36

15 1/2

 

 

 

mm

914

394

 

 

 

 

 

GHC/GRD-6500

in.

40 3/4

18

mm

1035

457

 

 

 

 

 

ous floor or platform with appropriate framing for support and so that no cold air can enter the room from under the fireplace.

The fireplace may be positioned and then the framing built around it, or the framing may be constructed and the fireplace positioned into the opening.

Usually, no special floor support is needed for the fireplace, however, to be certain:

1. Estimate the total weight of the fireplace

system and surround materials such as brick,

Outside Chase Installation

Figure 8

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

stone, etc., to be installed.

7

Page 7
Image 7
Superior GHC/GRD-5500 Construct the appliance framing, Position the appliance, Model No, Corner Installation