MECHANICAL INSTALLATION 110TB
Figure 1: Hanger Bolt
Figure 5: Turnbuckle
Figure 3: Backing Nut
Figure 4: Threaded Rod Assembly
Figure 2: Coupling Nut
Figure 6: Wire Rope Nut & Thimble | Figure 7: |
2’ x 2’ Tile Grid Installation Procedures:
1)The 110TB was designed for quick and simple installation directly into a 2’ x 2’
2)Remove several tiles around the installation location to gain easier access for lacing the subwoofer in the ceiling grid.
3)Be certain that there is sufficient hanger wire suspending the grid where you intended to install the subwoofer. If not, it may be necessary to add additional grid hanger wires around the perimeter of the location, as required. We recommend a minimum of four per sub location located on the main grid support bar within four inches of each of the four corners of the subwoofer.
4)Using wire rope or chain, select opposing corners on the subwoofer to connect safety lines, or seismic tethers (Figs. 8 & 9) securely to the structure. These lines should be taut enough to support the majority of the weight of the 110TB, yet leave enough load against the ceiling grid to prevent the grid from buzzing. Be sure all tether points are securely fastened to the subwoofer and achored securely to the substructure of the building.
Free Space Installation Procedures
1)For an installation in free space, select a location that will allow suspension from directly above the subwoofer. Begin by measuring a
2)Thread a coupling nut all the way over a hanger bolt, and with a 9/16” socket set, start threading the hanger bolt into the support structure. Secure a hanger to a substructure at all four corners. This may be accomplished several ways depending on your particular installation.
(continued on page 14)