18 Model C043Operating Procedures
Sanitizing
Step 1
Using lukewarm water, prepare an approved 100
PPM sanitizing solution (examples: 5 gal. [19 liters]
of Kay-5Ror 4 gal. [15 liters] of Stera-SheenR).
USE WARM WATER AND FOLLOW THE
MANUFACTURER'S SPECIFICATIONS.
Step 2
Place the feed tube and the flow control rod flat on
the bottom of the hopper.
Figure 18
Step 3
Place the product chutes in the hopper.
Figure 19
Step 4
Make sure the draw arm plate is closed andthe
short door stud nuts are snug.
Figure 20
Step 5
Attach the splash guards to the door studs.
Figure 21
Step 6
Make sure the refrigeration switch and the hopper
refrigeration switch are in the “OFF” posit ion.
Figure 22
IMPORTANT! Refrigerationshould NOT be on
when water is present in the freezing cylind ero r
hopper.