29
Model C043 Operating Procedures
Step 5
When custard appears, adjust the flow adjustment
knob to gain the desired custard texture. T urn the flow
adjustment knob clockwise if the product is too firm
and counter-clockwise if the product is too soft .
Figure 63
Step 6
When the product looks servable, close the draw
arm plate. Using sanitized hands,installa
sanitized custard chute.
Figure 64
Step 7
Open the draw arm plate. Continue to run the frozen
custard into the holding cabinet until the desired
amount is obtained. Adjust the mix flow as needed
to maintain proper product consistency. When t he
desired amount is obtained and more custard will be
made later, follow the “Hold Cycle During
Operation” instructions start ing on page 26.
Figure 65
Preparing for Shutdown
Perform the following procedures to remove the
remaining custard in the freezing cylinder when
there is mix in the hopper.
Step 1
Place the refrigeration switch in the “OFF” position.
Figure 66
Step 2
Set the timer for 20 minutes. This allows t hef reezing
cylinder enough time to warm before removing the
remaining custard.