11
Models RD30/RC25 Operating Procedures
Section 6 Operating Procedures
We begin our instructions at the point where the parts
are disassembled and laid out to dry from the previous
night’s cleaning.
The following procedures will explain how to assemble
the parts into the freezer, sanitize them, and pr ime the
freezer with fresh product.
If you are disassemblingthe machine for the first time
or need information to get to this starting point in our
instructions, turn to “Disassembly” on page 19, and
start there.

Assembly

MAKESURE THE CONTROLSWITCH IS IN
THEOFF POSITION.Failure to do so may result in
personal injury or componentdamage.
Note: When lubricating parts, use an approved f ood
grade lubricant (example: Taylor Lube HP). Every
three months discard rubber parts and install new
rubber parts.
Step 1
Install the beater drive shaft. Lubricate the o- ring
groove. Slide the o- ring into the first groove on the
drive shaft. Lubricate the groove, o- ring and shaft
portion that comes in contact wit h the rear shell
bearing on the beater drive shaft. DO NOT lubricat e
the square end of the drive shaft.
Figure 2
Slide the seal over the shaft until it snaps into the
groove. Fill the inside portion of the seal with lubricant
and evenly lubricate the flat s ide of the seal that fits
onto the rear shell bearing.
Figure 3
Install the drive shaft into the freez ing cylinder, square
endf irst. The drive shaft seal must fit securely over the
rearshell bear ing. Be certain the drive shaft f its into the
drive coupling without binding.
Figure 4