15
Models RD30/RC25 Operating Procedures
081029
Step 6
Install the handscrews on the studs. Tighten the
screws equally, using a criss- cross pattern. Do not
overtighten the handscrews.
Figure 19
Step 7
Install the torque arm. Position the torque arm by
inserting it through the slot in the torque switch arm and
down into the hole in the torque rotor which protrudes
from the door. Verify proper installation by moving the
torque rotor back and forth to be sure it moves freely
and easily.
Figure 20
Step 8
Install the front drip tray and splash shi eld. Install
the front drip tray and the splash shield under t he door
spout.
Figure 21
SanitizingStep 1
Fill System. Disconnect the product supply lines from
the mix delivery container. Prepare a pail of approved
100PP M sanitizing solution (examples: 2- 1/2 gal. [9.5
liters] of Kay- 5Ror 2 gal. [7.6 liters] of
Stera- SheenR). USE WARM WATERAND FOLLOW
THE MANUFACTURER’S SPECIFICATIONS. Pour
the solution into a clean, empty mix delivery container.
Connect the container to the mix delivery line.
Figure 22