2-17

Installation
8. Place the pair of new black cables over the proper studs in the Primary and Redundant Power Supplies, routing the cables through the slot in the bottom of the Primary supply and the top of the Redundant supply. (The colors must match those of the existing cables.)

Figure 2-10. Switcher Redundant Power Supply Installation

Black Cables
from Switcher
Black Cables
from Primary
Power Supply
Lock Washers
Studs
Lock
Washers
Hex
Nuts
Route Cables
Down Through
Slot in Top of
Lower Chassis
Red Cables
from Primary
Power Supply
Hex Nuts
Lock Washers
Tighten Captive
Screws to Upper
Chassis
(8 Places)
NOTE:
Always Insert Black Cables
In Slots Before Red Cables
If Present,
Remove
Connector
Cover Plate
From Primary
Power Supply If Present,
Remove Slot
Cover Plate
From Primary
Power Supply
Connector Cover Plate
Should Remain on Bottom of
Redundant Power Supply
Slot Cover Plate Should Remain on
Bottom of Redundant Power Supply
Primary
Power Supply
Redundant
Power Supply
Switcher
Frame
Red Cables
from Switcher