2-1
2Installation
Introduction
This section describes the installation and setup of the Model 2200 Digital
Switcher. Installing the Model 2200 is done in the following order:
■Unpacking
■Installing the Control Panel
■Installing the switcher frame in the rack
■Option Installation
■Cabling the equipment
■Power connections
■Configuring, testing and timing the installed system
Also included in this section are procedures to connect peripheral
equipment such as Grass Valley Editors, KALEIDOSCOPE, DPM-700,
Tally Control and GPI connections to the Model 2200.