Thermo Products AH2-A, AH1-A service manual Model, Suction Line, Liquid Line, Tubing Installation

Models: AH1-A

1 22
Download 22 pages 23.58 Kb
Page 15
Image 15
TUBING INSTALLATION

All installations and services must be performed by qualified personnel.

 

 

75’-100’ TOTAL LINE LENGTH

MODEL

SUCTION LINE

 

LIQUID LINE

 

 

 

 

1224 & 1230

1”

 

1/2”

1236 & 1242

1-1/8”

 

5/8”

NOTES:

For line lengths over 25’ adjust charge accordingly per foot of variation from chart.

.65 oz. per foot for 3/8” and 3/4” line set

.674 oz. per foot for 3/8” and 7/8” line set

.694 oz. per foot for 1/2” and 7/8” line set

.72 oz. per foot for 1/2” and 1” line set

.76 oz. per foot for 5/8” and 1-1/8” line set

These charges are to be used in conjunction with a superheat measurement for best performance.

TUBING INSTALLATION

The compressor oil is constantly pumped through the refrigerant lines in normal operation of an air conditioning system. To ensure proper lubrication of the compressor by avoiding oil accumulation at undesirable points in the system, follow the guidelines listed below:

1.No traps in the suction line are necessary if the outdoor condensing unit is level with the indoor evaporator coil or the indoor evaporator coil is 4 feet or less lower then the outdoor condensing unit. Any horizontal runs of suction line should have minimum 1/2" pitch for every 10 feet of line towards the outdoor condensing unit. See Figure F below.

13

Page 15
Image 15
Thermo Products AH2-A, AH1-A service manual Model, Suction Line, Liquid Line, Tubing Installation