All installations and services must be performed by qualified personnel.
5.Make appropriate hydronic connections to inlet(blower side) and outlet(duct side) of coil and braze into place.
6.Seal connections through panel with duct sealer or equivalent.
: If drilling or screwing into panel or plate is necessary, make certain drill does not penetrate into any part of evaporator coil or hot water coil. Personal injury and/or property damage may result.
Figure C
NOTE: Drain lines must be pitched no less than 1/4" per foot away from the air handler.
TRIM PANEL INSTRUCTIONS:
Included as a loosely packed part in the condensate drain pan of both air handlers is two trim panels. These panels are to be used in reducing the free area between both the hydronic coil lines and the evaporator coil lines. The hydronic coil panel has two holes which the inlet and outlet lines fit through. This panel is to be secured to the air handler via the prepunched holes and included screws. The evaporator coil panel is a flat rectangular panel measuring
BLOWER AIR ADJUSTMENT
The direct drive blower must be set in order to establish proper air movement. Use the following steps to do this:
*For cooling only remove low speed connection to terminal block unless continuous fan is desired.
7