Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure | Description | Qty. | Use | |
|
|
|
| |
1. | No parts required | – | Unfold the handle. | |
|
|
| ||
2. | Screws | 3 | Install the discharge chute. | |
Chute assembly | 1 | |||
|
1. Unfolding the Handle
Procedure
1.Loosen the lower handle knobs, pull out the handle bolts until you can move the handle freely, and rotate the handle to the operating position (Figure 3).
Important: Ensure that you do not pinch or kink the control cable or the Quick Shoot™ cables (Figure 5).
Figure 5
1. Control cable | 2. Quick Shoot™ cables |
Figure 3
1.
2.Insert the end of the
Figure 4
5