Toro TMC-212 manual Display will be flashing P On Pump On

Models: TMC-212

1 44
Download 44 pages 10.14 Kb
Page 31
Image 31

Note: For information regarding the practical application of the PS/MV control features, refer to the examples provided on pages 38 and 39.

Turn the control dial to the SPECIAL FUNCTIONS position. See Example 1.

Check the PROGRAMS switch setting. If necessary, reposition the switch to select the desired program.

Example 1

The display will be flashing P On (Pump On).

To toggle PS/MV circuit operation Off for this program, press the –/OFFbutton to display P OFF (Pump Off).

Press the NEXT button to display the Pump Delay feature. Pd 02 (Pump Delay - 2 seconds) will be displayed.

To change the delay period, press the +/ON or –/OFFbutton to select 2 to 60 seconds .

Press the NEXT button to display the Well Recovery delay period. Well Recovery symbol and S 00 (0 seconds) will be displayed. See Example 2.

Example 2

 

Seconds

Minutes

To select a Well Recovery delay period from 1 to 60 seconds or 1 to 60 minutes, press the +/ON or –/OFFbutton. The display will change from S (Seconds) to M (Minutes) as the displayed time is increased past 59 seconds.

Note: The Well Recovery symbol will remain displayed as a reminder that a delay time is set.

Press the NEXT button to display the Pump Enable option. PE Y (Pump Enable-Yes) will be displayed by default.

Note: If the PS/MV circuit is enabled during a Well Recovery delay period, it will operate during the delay period between stations and turn off with the last operating station in the program.

(Continued on page 30.)

29

Page 31
Image 31
Toro TMC-212 manual Display will be flashing P On Pump On