RECEIVING, INSPECTION AND HANDLING

RECEIVING AND UNPACKING

The circuit breaker units are subjected to factory production testing prior to being packed and shipped.

ACCEPTANCE INSPECTION

Confirm that the circuit breaker and cell units are complete, correct as specified and undamaged from shipment and handling.

Upon receipt of the equipment, do the following:

1)Make an immediate inspection for damage that might have occurred during shipment. If damage is discovered, it should be noted with the carrier prior to accepting the shipment, if possible.

2)Carefully unpack the equipment sufficiently to check for missing parts or concealed damage.

3)Check for the presence of accessories that are shipped with the circuit breaker and cell:

-Charging Handle (Fig. 5)

-B9 Grease (Fig. 6)

-Control Wire Harness (Fig. 7)

3) Keep the circuit breaker and cell upright.

CAUTION

Never lay the circuit

 

breaker or cell on its side

 

or upside down. This may

 

cause damage.

4)File a claim with the carrier for any damaged or missing items and immediately notify the nearest Toshiba representative.

Fig. 5 Charging Handle

Fig. 6 B9 Grease

WARNING

Do not install or energize equipment that has been damaged. Damaged equipment can fail during operation, resulting in fire and explosion.

Fig. 7 Control Wire Harness