INSTALLATION | Page 13 |
MOUNTING THE CIRCUIT BREAKER CELL
The circuit breaker cell is designed to mount to the floor or shelf of the installation compartment. The floor or shelf to which the cell is mounted should be flat and level within ± 0.5 mm (± 0.02 in.). If there are any noticeable gaps between the cell base and the mounting surface, fill them in using flat washers as spacers.
Fasten the cell using four (4) M8 hex head bolts (Fig. 11). The tightening torque should be 120- 150
MAIN CIRCUIT CABLE CONNECTIONS
Route cables that connect to the circuit breaker cell to avoid interference with sharp edges and moving parts. Observe minimum bending radius for the type of cable used.
Power cables should be braced and/or laced to withstand
Fasten the cables to the main circuit terminals (Fasten the cables to the main circuit terminals Fig. 12). Use 35 mm Class 8.8 M10 or M12 hex head bolts, 2 flat washers, a lock washer and a nut. While securely preventing the nut from rotating with a wrench, torque the bolt to
CAUTION Use two wrenches to torque the connection to prevent applying excessive force to the terminal that can damage the frame.
Fig. 11 Fastening Cell to Compartment Floor or Shelf
Fig. 12 Fastening Cables to Main Circuit Terminals