TP-Link TL-SG5412F, TL-SG5428 manual 4444Console Port, 4444Verify Installation, 4444Power On

Models: TL-SG5428 TL-SG5412F

1 32
Download 32 pages 875 b
Page 20
Image 20
4444Console Port

4444Verify Installation4444Power OnManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background L2 Managed Switch

4444Console Port

CLI (Command Line Interface\ enables you to manage the Switch, thus you can load the CLI after connecting the PCs or Terminals to the console port on the Switch via the provided cable.

Connect the console port of the device with your computer by the console cable as the following figure shown.

FFFFFFFFFFFFConnecting the Console Port

You can also manage the device through the console port, for details please refer to the

CLI Reference Guide on the resource CD.

Note:

The console port is the first port on the right of the front panel.

Please keep the device power off when plugging the console cable. Do not connect the console port with other ports by RJ45 cable.

4444Verify Installation

After completing the installation, please verify the following items:

There are 5~10cm of clearance around the sides of the device for ventilation and the air flow is adequate.

The voltage of the power supply meets the requirement of the input voltage of the device.

The power socket, device and rack are well grounded.

The device is correctly connected to other network devices.

4444Power On

Plug the female connector of the provided power cord into the power socket of the device, and the male connector into a power outlet as the following figure shown.

15 Manual background Connection

Page 20
Image 20
TP-Link TL-SG5412F, TL-SG5428 manual 4444Console Port, 4444Verify Installation, 4444Power On