Trane Modu manual Rigging and Handling, Unit Shipping

Models: Modu SCWG 020, SCWG 025, SCWG 030, SCWG 035, SIWG 020, SIWG 025, SIWG 030, SIWG 035, SCRG 020, SCRG 025, SCRG 032, SIRG 020, SIRG 025, SIRG 032 SCWG 020, SCWG 025, SCWG 030, SCWG 035, SWG 020, SWG 025, SWG 030, SWG 035, SCRG 020, SCRG 025, SCRG 032, SRG 020, SCRG 025, SCRG 032

1 124
Download 124 pages 57.08 Kb
Page 13
Image 13

Pre-Installation

Installation Considerations

Rigging and Handling

Unit Shipping

1.Position rigging sling under wood shipping skid.

2.Use spreader bars to avoid unit damage.

3.When using a forklift, exercise caution to prevent unit damage.

4.Use the standard fork length to lift one end and drag or pull unit while skidding the opposite end.

5.The unit center of gravity will fall within center of gravity block at various locations depending on unit options.

6.Use hooks to lift fan section only. Do not hook into open channels to lift unit.

7.See unit nameplate for unit weight.

8.Do not stack units.

! CAUTION

Do not use hooks to lift unit or hook into open channels to lift unit. This could cause unit

damage.

Figure I-PC-7. Assembled modular unit proper rigging.

 

 

Fan Section

Figure I-PC-8. Split-apart modular unit proper rigging.

SCXG-SVX01B-EN

13

Page 13
Image 13
Trane Modu manual Rigging and Handling, Unit Shipping