Transition Networks E-TBT-HB-0804, 33022.B Installation, Unpacking the LANMaster T8, Part Number

Models: 33022.B E-TBT-HB-0804

1 12
Download 12 pages 40.91 Kb
Page 8
Image 8
3. INSTALLATION

3. INSTALLATION

To install the LANMaster T8:

Unpack the LANMaster T8

Install LANMaster T8 at site

Install Network Cable

Power the LANMaster T8.

Direction is provided in the pages that follow.

Unpacking the LANMaster T8

The LANMaster T8 packing contents should include the following:

Item

Part Number

LANMaster T8 Hub

E-TBT-HB-0804

 

(includes mounting brackets and screws,

 

BNC T-connector and terminator, and

 

adhesive-backed rubber feet)

Power Supply Adapter

3532, 3533, 3534, 3535, or 3536

 

(depending upon power configuration

 

in country where installed)

User’s Guide

33022

Powering the LANMaster T8

To power ON the LANMaster T8:

1.Verify that the LANMaster T8 power supply adapter is the correct one for the site installation.

2.At LANMaster T8 back, locate the power receptacle.

3.Connect the LANMaster T8 power connector end of the power supply adapter to LANMaster T8 power receptacle.

4.Plug external power connector end (male) of the power supply adapter into correct voltage AC wall socket.

5.At LANMaster T8 front, verify that Act(ivity) LED is illuminated.

5

LANMaster™ T8

8-Port Ethernet™ Repeater Hub

14

Page 8
Image 8
Transition Networks E-TBT-HB-0804 Installation, Unpacking the LANMaster T8, Powering the LANMaster T8, Part Number