Figures
Figure | ||
Figure | ||
Figure | System Status LED | |
Figure | Power Supply Sockets | |
Figure | Collapsed Backbone | |
Figure | Network Aggregation Plan | |
Figure | Remote Connection with Fiber Cable | |
Figure | Making VLAN Connections | |
Figure | Attaching the Brackets | |
Figure | Installing the Switch in a Rack | |
Figure | Attaching the Adhesive Feet | |
Figure | Inserting an SFP Transceiver into a Slot | |
Figure | Power Sockets | |
Figure | ||
Figure | Making | |
Figure | Network Wiring Connections | |
Figure | Making Fiber Port Connections | |
Figure |
| |
Figure |
| |
Figure | Crossover Wiring |
xii