True Food Service Equipment, Inc.

INSTALLATION / OPERATION INSTRUCTIONS

HEATED CABINET SHELVING INSTALLATION/ OPERATION

SHELF INSTALLATION:

A.Hook shelf clips onto shelf standards.

B.Position all four shelf clips equal in distance from the floor for flat shelves.

C.Shelves are oriented so that cross support bars are facing down.

D.Place shelves on shelf clips making sure all cor- ners are seated properly.

INSTALLING SHELF STANDARDS IN HEATED CABINETS: (See Image 2)

A.When installing shelf standards make sure the numbers on the standards are facing up. These numbers help with installing shelf clips at a level height.

B.All standards are installed in the upper most

threaded hole near the ceiling of the cabinet. This will leave a threaded hole vacant below each shelf standard. A plastic plug is provided to cover the open threaded slot.

Shelf

Shelf

Clip

Thumb

Screw

Shelf

Standards

Shelf

Image 2

Standards

 

Shelf

Image 1

12

www.truemfg.com

12

Page 14
Image 14
True Manufacturing Company TR1RRI-1S, TR2RRT-2S-2S installation manual Heated Cabinet Shelving INSTALLATION/ Operation