True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
LOCATING
Step 2
A.Carefully lay the unit on its back to remove skid.
Place packing material behind cabinet as a cushion. When lifting unit remember to
leave the cabinet upright for 24 hours before
plugging into power source.
B.Remove skid by unscrewing all base rail anchor brackets. Place skid to the side.
C.Carefully upright cabinet.
Removing skid from bottom of cabinet.
INSTALLATION OF LEGS AND CASTORS
Important Safeguard for installation of leg/castor (Images
Step 3 | side. (diagonally) | |
Securing Castors and Legs | B. Install the desired number of shims, making sure | |
To obtain maximum strength and stability of the | ||
the slot of the shim is in contact with the threaded | ||
unit, it is important that you make sure each castor | stem of the castor. | |
is secure. Legs are | C. If more than one shim is used, turn the slot at a | |
the lower rail assembly. The bearing race on the | ||
90° angle so they are not in line. | ||
castor of the top edge of the leg must make firm | ||
D. Turn the bearing race clockwise to tighten and | ||
contact with the rail. | ||
secure the castor by tightening the anchoring bolt | ||
Unit leveling | ||
with a 3/4 inch | ||
Four leveling shims have been provided for | ||
tool provided. | ||
leveling castored units positioned on uneven | ||
CAUTION | ||
floors. Shims must be positioned between rail | ||
end and bearing race. | To avoid damage to lower rail assembly, | |
| ||
A. Turn the bearing race | slowly raise unit to upright position. | |
the cabinet is level. Level front to back and side to |
|
1 |
| 2 |
| 3 |
Thread castor into the underside of cabinet frame rail.
For leveling, insert the shim between the castor and frame rail.
Use the tool provided to tighten the castor into place.
4
Thread leg into cabinet bottom frame rail.
5
The end of the leg is adjustable to easy leveling.
6 | www.truemfg.com | 6 |