Turbo Chef Technologies TD030* 208 installation instructions Installation Instructions

Models: TD030* 208

1 12
Download 12 pages 14.07 Kb
Page 1
Image 1
Installation Instructions:

Para instrucciones en español, vea páginas 7-11.

Installation Instructions:

The TurboChef 30˝ Double wall speedcook oven

Model Numbers: TDo30 * 208 / TDo30 * 240

*Indicates a two letter code – OR, RD, BU, CH, IV, WH, or SS – which refers to the oven door color.

for complete installation instructions see pages 2-3.

Retain these instructions for use by an Electrical Inspector and for future reference.

Please Note

Front

figure 1: The oven is shipped with two (2) support rails attached to the bottom of the oven exterior. These rails allow the oven to sit level and keep the bottom of the frame from being damaged during installation. To properly place the oven into the cabinets, the support rails must be removed as shown below.

figure 2: When the unit is lifted into the cabinet opening, the installer will need to remove the support rails to allow the oven to slide into the opening properly. Remove each support rail by unscrewing the support screw on either side of the rail. Supports should then slide off the oven base.

screw hole locations

figure 3: The oven must be secured to the cabinets using the two (2) screws provided. Please refer to the illustration to the left for the exact location and positioning of the screws.

Page 1
Image 1
Turbo Chef Technologies TD030* 208 installation instructions Installation Instructions, Please Note