INITIAL START-UP

Once installation and leveling is complete, the unit is ready for initial start-up and operation.

1.Plug the appliance cord into a 115V polarized and grounded elec- trical outlet.

2.Open the water supply valve in the main water source.

3.Put the cycle selector switch in the ICE position (press the switch to the right). The water fill valve will energize and fill the water reservoir. The water fill valve shuts off after 180 seconds. The compressor begins to operate and water flows over the evapora- tor assembly (ice cube tray).

4.Upon initial start-up, water flow over the evaporator may be uneven. This may cause uneven sized cubes or water spilling into the ice storage bin. This is a normal situation and will correct itself within the first twenty-four hours of operation. After the initial start-up period, the water will cascade evenly over the evaporator.