Dutchwest Non-Catalytic Convection Heater

Stove and Chimney Connector Clearance Charts

Model 2479 Large Convection Heater

 

UNPROTECTED SURFACES

PROTECTED SURFACES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Corner

 

 

 

 

Corner

 

Parallel Installations

Installations

Parallel Installations

 

Installations

Stove Clearance

Side

 

Rear3

Corner

Side

 

Rear3

 

Corner

No heat shields

(A) 21”

 

(B) 26”

(C) 21¹⁄

(D) 8”

 

(E) 20”

 

(F) 16¹⁄

 

(533 mm)

 

(660 mm)

(546 mm)

(203 mm)

 

(508 mm)

 

(419 mm)

Rear exit,

(G) 23”

 

(H) 13”

N/A

N/A

 

N/A

 

N/A

flue collar heat shields

(584 mm)

 

(330 mm)

 

 

 

 

 

 

Top exit1,2, flue collar

(K) 15”

 

(L) 15”

(M) 12¹⁄

(N) 8”

 

(O) 12”

 

(P) 10”

Single-wall connector

(381 mm)

 

(381 mm)

(318 mm)

(203 mm)

 

(305 mm)

 

(254 mm)

w/connector heat shield

Right Side

 

 

 

Right Side

 

 

 

 

and right side heat shield

Only

 

 

 

Only

 

 

 

 

Top exit1 , flue collar

(K) 20”

 

(L) 16”

(M) 12¹⁄

(N) 8”

 

(O) 14¹⁄

 

(P) 12”

heat shield,

(508 mm)

 

(406 mm)

(318 mm)

(203 mm)

 

(368 mm)

 

(305 mm)

Double wall connector

 

 

 

 

 

 

 

 

 

Chimney Connector Clearance: To Rear Wall Combustible Surface

 

 

 

 

 

Single-wall connector

 

 

20”

 

 

 

14”

 

No connector heat shield

 

 

(508 mm)

 

 

 

(356 mm)

 

Single-wall2connector

 

 

 

 

 

 

 

 

 

w/connector heat shield

 

 

9”

 

 

 

6”

 

& flue collar heat shield

 

 

(229 mm)

 

 

 

(152 mm)

 

Double-wall connector

 

 

10”

 

 

 

8¹⁄

 

& flue collar heat shield

 

 

(254 mm)

 

 

 

(216 mm)

 

Front Clearance to Combustibles:

(All Installations)

 

48” (1219 mm)

 

 

 

 

 

 

 

 

 

 

 

1.Shielding for a top exit stove must include a flue collar shield to protect the area behind the flue collar.

2.Chimney connector heat shields must extend exactly 24” (610 mm) above the flue collar of the stove.

3.Dimension is to the top plate of the stove, not the back wall of the stove.

Important:

When choosing an installation utilizing the side loading door located on the left side of the stove, follow the minimum dimensions given in the Stove and Chimney Connector Chart on Page 4 and the Minimum Dimen- sions for Noncombustible Floor Protectors given on Page 9, Figure 12.

For operation of the side loading door, the minimum clearances on the left side of the stove for usable opera- tion is 14¹⁄₂” (368 mm) in a corner installation and 20” (508 mm) in a parallel installation.

30002291

13

Page 13
Image 13
Vermont Casting 2479 manual Corner Parallel Installations Stove Clearance Side Rear3, Right Side, Only