Resolute Acclaim Woodburning Stove
Alcove Installations
Because of their restricted air flow and heat retention characteristics, specific construction requirements and special clearances apply to installations into alcoves. No stove or chimney connector heat shields are used in alcove installa- tions. Bottom heat shield requirements remain the same as for other installations.
ALCOVE INSTALLATION OF THE RESOLUTE ACCLAIM IS NOT PERMITTED IN CANADA.
Construction Requirements
Showing noncombustible ceiling framing and maximum and minimum permitted dimensions.
| ST504 |
Fig. 22 | Cutaway perspective of alcove installation. |
Joist Shield (supplied by chimney manufac- turer)
1” air gap top and bottom, on both sides and back wall
Metal
Stud
Combustible facing may overlap metal studs by only 1”
7/16” Durock© (or equivalent)
R E S O L U T E
Acclaim
ST609
Existings |
| 24" |
Combustible Framing |
| |
|
| 11" |
Metal studs |
| Min. |
support 7/16” |
|
|
Durock© (or |
| 36" |
equivalent) |
| |
| Min. | |
ceiling |
| |
|
| |
| 14¹⁄₄" |
|
| 48" Min. | ST505 |
|
| |
Fig. 23 Reflected ceiling plan. |
|
|
Fig. 25 Alcove side section.
Ceiling sup- port package extends 2” below Durock© (or equivalent) ceiling
1” air gap, |
| 62" Min. | |
top, bottom, | 65" | ||
to Alcove | |||
on both sides |
| ||
and back wall |
| Ceiling | |
NOTE: From |
|
|
36"
(914mm) Use recommended Max. floor protection
48" (1219mm) Min.
7/16” Durock© (or equivalent) spaced 1” off wood studs on noncombustible spacers
ST502
62” to 65” must |
be covered by |
a noncombus- |
tible material. |
ST610
Fig. 26 Front section: 65” minimum clearance to combus- tibles on front face. Combustible facing may overlap metal
Fig. 24 Floor plan. Sheetrock on front face butts to Durock© (or equivalent) alcove lining.
studs by only 1”. It should not extend below the height of the noncombustible ceiling.
16 | 2000893 |