FULL OVERLAY PANEL INSTALLATION
Step #1
1.A #10 pan head wood screw should be used to properly secure the overlay panel. A total of 8 screws will be needed.
2.Use only pan head screws.
3.Do not select a screw that is longer than the wood thickness of the screw locations.
4.Use recommended pilot holes for the frame material. (Use chart below.)
Pilot Hole Drill Sizes for Wood Screws
| Wood Screw Size #10 |
Work Material | Pilot Hole Size |
Hardwood | 3/32 |
Softwood | 5/64 |
5/16 Phillips Head Screws Holding Drawer Front (8 total)
Gasket
Step #2
Remove Drawer Fronts
(Note: The overlay panel may be installed without removing the drawer fronts from the drawer bodies, but the full drawer assembly is not as easy to handle as the drawer front alone.)
1.Remove drawer from unit. Begin by pulling out the drawer. Locate the drawer lock which
can be found on the outside of |
| |
the cabinet slide. (Figure 1). |
| |
Push the back of the drawer |
| |
lock forward and then down, |
| |
releasing the drawer from the |
| |
cabinet slide. (Figure 2). Repeat |
| |
this on the opposite side of the |
| |
drawer. Lift the drawer up from |
| |
the slides at 90o to fully remove |
| |
the drawer from the cabinet. | Figure 2 | |
(Figure 3). | ||
2. Remove drawer fronts. Do this |
| |
by removing the 8 phillips |
| |
screws and washers securing the |
| |
drawer front to the drawer body. |
| |
Mark lightly with an erasable | Figure 1 | |
marker the position of the |
| |
stainless drawer liner where it is |
| |
secured to the stainless drawer |
| |
before removing screws. |
| |
3. Remove the gasket from the |
| |
drawer front. Do this by pulling |
| |
the gasket our of the channel |
| |
that holds it to the drawer front. | Figure 3 | |
This will expose the clearance | ||
| ||
holes for mounting the overlay |
| |
panel. |
|
6