Viking Refrigerator Drawer manual FULL OVERLAY PANEL INSTALLATION con’t

Models: Refrigerator Drawer

1 12
Download 12 pages 27.05 Kb
Page 7
Image 7
FULL OVERLAY PANEL INSTALLATION (con’t)

FULL OVERLAY PANEL INSTALLATION (con’t)

Step #3

Sizing the Overlay PanelManual background

23 5/8” (60.0 cm)

153/16” (38.6 cm)

Manual background 9/16” (1.4 cm)

Manual background 11 13/16” (30.0 cm) Manual background

23 1/16” (58.6 cm)

14 5/8”

(37.1 cm)

7 19/32”

(19.3 cm)

9/16”

(1.4 cm)

Step #4

Attaching the Overlay PanelManual background to the Door

1.Set the overlay panel on drawer front face and align edges. Clamp panel in position and mark pilot hole locations. See Step #3 for nominal size and hole locations. Drill pilot holes (remove panel if necessary, re-align and re-clamp overlay to drawer face.)

2.Insert wood screws through clearance holes and tighten to secure overlay panel.

3.Reinstall gasket into channel. Make sure the corners are inserted fully.

Step #5

Reattach Drawer Front to Drawer Body

Align mounting holes on drawer body with mounting holes on drawer front. Align the door liner to the front flanges by using the erasable marker alignment lines that were applied prior to removing the door from the drawer. Reinstall phillips head screws and washers. Snug down, but do not tighten fully, final adjustment of drawer front will be done after reinstalling the drawer.

Step #6

ReinstallManual background the Drawer

1.Fully extend drawer slides and place drawer on slides. Be sure that drawer sits evenly on both sides.

2.Lock drawers into drawer slides. Push drawer locks down and then back to relock the drawer into the slide.

Step #7

Adjust Drawer Front

1.Adjust drawer front to achieve a 1/8” gap from the top of the drawer front to the top of the cabinet or (for bottom drawers) 1/8” from the top of the drawer front to the bottom of the top drawer, the drawer front should be centered between the cabinet edges.

2.Fully tighten phillips head screws

7

Page 7
Image 7
Viking Refrigerator Drawer manual FULL OVERLAY PANEL INSTALLATION con’t