S T E P 6 Y E L L O W B A G

A B

With the loop end of the cable (F13) in your hand, guide the cable through hole in top of weight stack tower and around pulleys A and B. Follow down weight stack tower and through pulley C. Wrap it around pulleys D and E on the pulley bracket and secure loop end onto cam (AF1) with two sleeves, one shoulder bolt (M8x26), and one nylon nut (M8).

Remove nut on bolt end of cable and place the selector pin tether (K10) on bolt shaft. Thread the nut on the bolt end of the cable all the way to the head of the bolt. Thread the bolt into the header plate, making sure that there is a minimum of 0.5” of engagement. Secure by tightening nut onto header plate.

F13

K10

E

D

C

AF1

16

Page 16
Image 16
Vision Fitness ST740 manual E P 6 Y E L L O W B a G