Vulcan-Hart ML-136221-00G24 manual Sequence Of Operation, From The Inside Out

Models: ML-136221-00G24

1 24
Download 24 pages 45.34 Kb
Page 19
Image 19
SEQUENCE OF OPERATION

SEQUENCE OF OPERATION

Operation is the same for all size griddles. connected to a terminal on each thermostat, terminal on the pilot solenoid.

The neutral wire from the power source is directly the N terminal on each ignition module and one

1.The power on/off switch is set to the ON position.

2.Voltage is applied to the following terminals

A.Terminal L1 on each igniter module – turning the module on

B.The NO terminal of each flame switch

C.The remaining terminal on the pilot solenoid – energizing the solenoid

3.The igniter electrode sparks against the pilot head and lights pilot burner

4.When the pilot flame is sensed – the igniter stops sparking

5.Pilot burner heats up flame switch sensor

6.When flame switch is sufficiently heated (cherry red) – the switch closes and supplies voltage to one terminal on each burner solenoid and one terminal on each indicator light

7.When a thermostat is rotated out of the OFF position – the neutral return is connected to the other side of the indicator light and the other terminal(s) on the other side of the burner solenoid(s)

8.The indicator light illuminates

9.Gas flows to the main burners and is ignited by the pilot flame.

FROM THE INSIDE OUT

WIRE HARNESS

SPARK IGNITOR

ORIFICE

SOLENOID

HARNESSFLAME SWITCHVALVE CONNECTOR

3/8” FLEX TUBE

MANIFOLD PIPE

- 19 -

Page 19
Image 19
Vulcan-Hart ML-136221-00G24 manual Sequence Of Operation, From The Inside Out