Plumbing

Ensure that the Aqua Rite® installation does not constitute a cross connection with the local potable water supply. Consult local plumbing codes.

The flow switch and cell should be plumbed in the return line to the pool/spa. The preferred installation is after (downstream) all the pool equipment (filter, heater, solar, etc.). The electrolytic cell and flow switch tee fitting are designed to be plumbed into 2" PVC pipe. Adapters (not included) can be used for systems with 1½" plumb- ing.

For proper plumbing, refer to the overview diagram on page 9. Alternate configura- tions #1 shows the flow switch can also be in front of the cell. Configurations #2 and #3 allow for chlorination of both the pool and spa during spa spillover operation, but prevent overchlorination of the spa during "spa only" operation. Never use configu- ration #4.

1

2

12î

 

min

 

 

12î

 

min

3

4

Flow Switch: IMPORTANT: There must be at least a 12" (30cm) straight pipe run before (upstream) the flow switch. If the switch is plumbed after the cell, the cell can by counted as the 12" of straight pipe. To ensure proper operation, verify that the arrow on the flow switch (located on top of gray hex) points in the direction of wa- ter flow.

Electrolytic Cell: Install using the unions provided. Tighten unions BY HAND for a watertight seal. For pool/spa combination systems with spillover, use configurations #2 or #3 above to allow chlorina- tion of both the pool and spa during spillover but preventing overchlorination when operating the spa only.

10

Page 13
Image 13
Waterpik Technologies Electronic Chlorine Generator manual Plumbing