Trolley installation for doors:
<9’ 2” All Heights
9’ 3” thru 16’ 2” X 10’ 1” (5 sections)
Trolley installation for doors:
9’ 3” thru 16’ 2” over 10’ 1” (5 sections) 16’ 3” thru 19’ 2” X 10’ 1” (5 sections)
6” WELDED TRUSS
TEK SCREWS
Trolley installation for doors:
16’ 3” thru 19’ 2” over 10’ 1” (5 sections) 19’ 3” thru 24’ 2”
OPERATOR ARM (SUPPLIED BY OTHERS)
(SUPPLIED BY OTHERS)
OPERATOR ARM (SUPPLIED BY OTHERS)
8” EXTENSION (REQUIRED TO CLEAR WELDED TRUSS)
CENTER HINGES
OPERATOR ARM (SUPPLIED BY OTHERS)
8” EXTENSION (REQUIRED TO CLEAR WELDED TRUSS)
38 in. operator bracket and dual trolley brackets are optional for doors 19’ 3” thru 24’ 2” wide.
TEK SCREWS
(2)
Dual Trolley installation for doors over 24’ 2” wide X any height.
8” WELDED TRUSS SHOWN
OPERATOR BRACKET
(2)
STEP 14: INSTALLING THE INSIDE SIDE LOCK: Attach the inside side lock using (4) 1/4” - 20 x 5/8” Tek screws as shown in Fig. O
8” EXTENSION (REQUIRED TO CLEAR WELDED TRUSS)
OPERATOR ARM (SUPPLIED BY OTHERS)
CENTER HINGES
FIG. O
PG. 15