NOTE: SUPPORT BRACKETS
ARE SUPPLIED ON ALL DOORS
REQUIRING DOUBLE END
STILES
An Extra Support Bracket
Will Need To Be Added To
Top Brackets On Double
Endstile Applications
Top bracket installation illustration.
Secure each bracket using (2) 1/4” X 7/8”
Refer To Strutting Schedule Insert.
Secure
Fig. K
Secure each end of Top Section using (2) 1/4 - 20 X 7/8” TEK Screws and Strut Clips per End
Stile
3” UBar
6” Welded Truss
Secure each end using
(2)1/4 - 20 X 7/8” TEK Screws per stile
STEP 4. Products over 12’2” require
Doors requiring trusses, position the truss below the lower hinge leaf (1/2” from the section edge) and secure truss using (2)
Doors requiring (2) welded trusses or 8” truss refer to Auxiliary Installation Instructions.
STEP 5. Leveling Door. (Bottom section) Center and level (or support to a known grade level) the bottom section in the opening, as seen in Fig. L. Temporarily attach the vertical tracks to the jambs. Allow 1/2” clearance between the section and the track as illustrated in the Sideroom illustrations.
It is important that the bottom of each track is in the same level. (shim if necessary)
Products being installed to precast or block must use a 3/8 x 3” long sleeve anchor to attach the verticals to the building. Use the slots in the wall angle as a drill template, drill a 3/8” hole
STEP 6. Installing the Door Sections Secure the end hinges, (one side only) center hinges, and strutting
( if applicable) as previously illustrated. Locate the Lock Section (usually the second) and insert a roller into the end hinge. Stack this section into the opening by hooking the roller in the vertical track and lower onto the bottom section. Insert a roller into the appropriate end hinge and insert into vertical track on the opposite end. Secure to the section using the
NOTE : Top section maybe installed now or may wait until the last step (installer preference)
STEP 7. Installing the Vertical Track: Adjust the vertical track to 1/2” spacing from the bottom section and 3/4” at the top section (splice) Refer to page 5. Permanently secure each vertical to the jambs using the following fasteners:
Steel Jambs: 5/16” x 1” self drilling and tapping screw.
Wood Jambs: 5/16” x
Precast or Block: 3/8” x 3” sleeve anchor.
The left hand vertical track assembly indicates the standard fastener spacing.
PG. 6