22.Remove the upper 3/8Ó x 3Ó Bolt (45) from the Top Frame (1) and the Main Upright (3).
Feed the bolt on the High Cable (73) down through the indicated slot in the Main Upright (3) in the direc- tion shown.
Wrap the High Cable (73) around a 4Ó Pulley (35) in the direction shown. Attach the Pulley inside the slot in the Main Upright (3) with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat Washers (55), two 5/8Ó x 1/2Ó Pulley Bushings (42), and a 3/8Ó Nylon Jam Nut (63).
23.Feed the bolt on the High Cable (73) under the weld- ed tube on the Press Frame (12) as shown. Wrap the High Cable down around a 4Ó Pulley (35) in the direc- tion shown. Attach the Pulley to the Press Frame (12) with a 3/8Ó x 8 1/2Ó Bolt (59) and a 3/8Ó Nylon Locknut (50).
Wrap the High Cable (73) down around another 4Ó Pulley (35). Attach the Pulley inside the indicated slot in the Main Upright (3) with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat Washers (55), two 5/8Ó x 1/2Ó Pulley Bushings (42), and a 3/8Ó Nylon Jam Nut (63).
24.Wrap the High Cable (73) down around a 4Ó Pulley
(35)in the direction shown. Feed the bolt on the High Cable (73) back through the slot in the Main Upright
(3)as shown. Attach the Pulley to the Press Frame
(12)with a 3/8Ó x 8 1/2Ó Bolt (59) and a 3/8Ó Nylon Locknut (50).
22 |
| 35 |
|
|
|
|
|
|
| 45 |
| 55 | 54 | ||
|
| Slot |
|
|
| ||
|
|
|
|
|
|
| |
| 50 |
|
|
| 42 | 73 | |
1 |
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
| 42 |
|
|
|
|
|
| 63 | 55 |
|
|
|
|
|
|
| Bolt |
|
|
|
|
|
|
| 3 |
|
|
|
|
|
23 | Welded Tube |
|
|
|
|
| |
| 73 | 12 |
|
| |||
|
|
| 42 | 54 | |||
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
|
|
|
|
|
|
| 55 |
| 42 |
|
|
|
|
| |
|
| 35 |
|
|
|
| 59 |
63 |
|
|
|
|
|
| |
55 |
|
|
|
| 35 | ||
|
|
|
|
|
|
| |
|
| 55 |
| Slot | 50 |
| |
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
|
|
|
|
|
|
| Bolt |
24 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 59 |
Slot |
|
|
|
|
|
| |
|
| 73 |
|
|
|
|
|
|
|
|
|
|
|
| 35 |
|
| 50 |
|
|
| 12 |
|
|
|
|
|
|
|
| |
Bolt |
|
| 3 |
|
|
| |
|
|
|
|
|
|
|
13