24.Remove the preattached 90mm Pulleys (78) from the Offset Double “U”-bracket (61).

Wrap the Swivel Cable (17) around a 90mm Pulley (78). Attach the Pulley to the Offset Double “U”- bracket (61) with an M10 x 45mm Bolt (93) and an M10 Nylon Locknut (87).

25.Wrap the Swivel Cable (17) around a 90mm Pulley (78). Attach the Pulley and a Cable Trap (68) to the next to bottom hole in the Small Pulley Plates (31) with an M10 x 50mm Bolt (100) and an M10 Nylon Locknut (87). Make sure the Cable Trap is turned to hold the Cable in the groove of the Pulley.

26.Wrap the Swivel Cable (17) around a 90mm Pulley (78). Attach the Pulley and a long Cable Trap (102) to the bracket on the Swivel Upright (5) with an M10 x 50mm Bolt (100) and an M10 Nylon Locknut (87). Make sure the Cable Trap is turned to hold the Cable in the groove of the Pulley.

27.Attach the end of the Swivel Cable (17) to the bracket on the Swivel Carriage (46) with an M10 x 20mm Bolt (13) and an M10 Nylon Locknut (87).

28.Locate the Lat Cable (88), which is 2310mm long and has a ball on one end and an eyelet on the other. Route the eyelet end of the Cable up through the Butterfly Top Frame (7) and around a 90mm Pulley (78). Attach the Pulley inside of the Butterfly Top Frame with an M10 x 67mm Bolt (121), two M10 Washers (91), two 12.5 Spacers (89), and an M10 Nylon Locknut (87).

24

 

 

 

 

 

17

 

 

 

78

 

 

 

93

 

 

 

87

 

 

 

61

 

25

 

 

 

 

 

31

100

 

 

87

 

 

 

 

 

78

 

 

 

68

 

 

 

17

 

26

 

100

 

 

 

 

 

 

5

 

 

102

 

 

87

 

 

 

 

17

 

 

 

78

 

27

 

 

 

 

46

 

 

 

87

13

 

 

 

 

 

 

17

 

28

 

 

 

 

87

78

 

 

 

 

 

91

 

 

 

89

89

 

 

 

 

 

7

91

121

 

 

 

 

88

 

13

Page 13
Image 13
Weider 831.153932 user manual 100 102 121