1.

FRAME ASSEMBLY

Make sure that you understand all of the information on page 5 before you begin assembling the weight system.

1

 

 

2

24

 

 

98

98

14

Locate and open the parts bags labeled “FRAME ASSEMBLY 1” and “FRAME ASSEMBLY 2.”

See the inset drawing. Attach the Base Cap (24) to the Short Base (2) with two M4 x 20mm Self-tapping Screws (14) and two M4 Washer (98).

Press a 50mm Square Inner Cap (105) into the open end of the Long Base (106).

Insert eight M10 x 65mm Carriage Bolts (110) up through the Long Base (106) and the Short Base (2) as shown. Note: It may be helpful to place tape over the heads of the Carriage Bolts to hold them in place.

Attach the Short Base (2) to the Long Base (106) with two M10 x 70mm Bolts (85), the Long Frame Plate (71), and two M10 Nylon Locknuts (87).

2.Press two 50mm x 75mm Inner Caps (58) into the Foot Plate (53). Attach the Foot Plate to the Long Base (106) with two M10 x 65mm Carriage Bolts

(110)and two M10 Nylon Locknuts (87).

3.Attach the tether on the Pin w/Tether (112) to the Long Base (106) with an M4 x 20mm Self-tapping Screw (14).

Attach the four Knee Rest Bumpers (30) to the Squat Knee Rest (41) with four M4 x 20mm Self- tapping Screws (14).

Attach the Squat Knee Rest (41) to the Long Base

(106)with an M10 x 85mm Bolt (96) and an M10 Nylon Locknut (87). Do not overtighten the Nylon

Locknut; the Squat Knee Rest must be able to pivot.

6

 

 

 

71

85

 

 

 

 

 

 

 

110

 

 

106

 

 

87

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

87

 

 

 

 

 

110

 

 

 

 

 

110

 

110

105

 

 

 

 

 

2

110

53

 

 

 

 

 

 

 

 

 

 

 

58

 

 

 

 

 

87

 

 

 

 

 

 

106

 

58

87

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

14

112

41

 

 

 

 

96

30

 

 

 

 

 

 

 

106

 

 

 

 

 

87

 

 

14

 

 

 

 

 

 

 

30

 

30

 

 

 

 

 

 

 

 

 

14

 

 

Page 6
Image 6
Weider 831.153932 user manual Frame Assembly, Locknut the Squat Knee Rest must be able to pivot